The Cookham Plan - Transport and Traffic


CONTENTS NEXT PAGE PREVIOUS PAGE

 

 

Contents

1      Summary of Findings

1.1     Introduction

1.2     Scope         

1.3     Key Assumption

1.4     Key Issues

1.5     Conclusions and Recommendations  

1.6     Implementation

2       Introduction and Background

2.1     Background

2.2     Strategic Overview

2.3     The scope of the project

2.4     The Cookham Survey

3     Road Safety

3.1     Remit         

3.2     Summary    

3.3     Suggestions  

3.4     Issues Covered Elsewhere in this Report

3.5     Conclusion   

4     School Parking Congestion


5     Parking and the Parade       

5.1     Background

5.2     Remit          

5.3     Methodology

5.4     Specific areas  

6     Flooding – Impact on Traffic and Transport


7     Cycling

7.1     Background to the suggestion of a Sustrans Cycle Route through Cookham.

7.2     Remit 

7.3     Potential Routes

7.4     Evaluation of the routes

7.5     The Bourne End Link

7.6     Recommendation

7.7     Other Cycling matters in Cookham

7.8     Map of Potential Cycling Routes

8     Public Transport - Report Summary

8.1     Summary of Recommendations 

8.2     Objectives

8.3     Findings – Current services

8.4     Local Authority Responsibilities

8.5     Recommendations 

8.6     Timetables and Fares

8.7     Acknowledgements

8.8     Supporting Material 

9     The Pound 

9.1    Introduction

9.2    Southern Bypass.

9.3    Gyratory System.

9.4    Footpath North of The Pound

9.5    Widening the footpath or constructing throats  

10   Appendix A

10.1  Members of the Traffic and Transport Team   

11   Appendix B   

11.1   Organisations and individuals consulted

12   Appendix C   

12.1   Letter from RBWM – Road Width Design Requirements         

13   Appendix D    

13.1   Car Parking – Letter from Stuart Conlin, The Stanley Spencer Gallery

 

click here for .pdf version of the report  (3.485mb)

CONTENTS NEXT PAGE PREVIOUS PAGE